K0522 K522: Have an externally vented heating system.
F

Failure to Maintain Boiler Heating System

Brookside Care CenterStockton, California Survey Completed on 12-04-2025

Summary

The facility failed to maintain its boiler heating system, resulting in an inoperable boiler that affected all 95 residents and all five smoke compartments. During an onsite investigation and interview with the Administrator, surveyors observed that the boiler heating system located in the mechanical room was not operational. This deficiency was identified through direct observation and confirmed by facility staff. As a result of the inoperable boiler, the facility was unable to maintain the required temperature levels throughout the building. The deficiency impacted the entire resident population, as the heating system is essential for maintaining a safe and comfortable environment. The report notes that the boiler could not be repaired after multiple attempts by heating and air system vendors, and the system remained nonfunctional for a period of time. The failure to maintain the boiler system and ensure its operability led to the inability to provide adequate heating for the residents. The deficiency was directly related to the lack of a functioning heating system, as evidenced by the observations and interviews conducted during the survey.

Plan Of Correction

1/5/26: POC approved by Cynthia Luc, SSM-I The facility will monitor the plan of correction in the QAPI meeting. The weekly parameter checks and monthly safety shutoff testing will be completed and logged by the Maintenance Director and reported weekly and monthly to the Administrator. Quarterly vendor inspection reports will be reviewed by the Maintenance Director and reported to the Administrator. These findings will be reported in the QAPI meeting for trending, analysis, and any further recommendations. Any audit discrepancies will trigger immediate corrective action, retraining, and evaluation. If no negative trends are identified after six months, the item will be removed from the QAPI agenda. All corrective actions will be fully implemented by 1/4/2026. The facility will monitor the plan of correction in the QAPI meeting. The weekly parameter checks and monthly safety shutoff testing will be completed and logged by the Maintenance Director and reported weekly and monthly to the Administrator. Quarterly vendor inspection reports will be reviewed by the Maintenance Director and reported to the Administrator. These findings will be reported in the QAPI meeting for trending, analysis, and any further recommendations. Any audit discrepancies will trigger immediate corrective action, retraining, and evaluation. If no negative trends are identified after six months, the item will be removed from the QAPI agenda. All corrective actions will be fully implemented by 1/4/2026. HVAC - Operating Features: The facility will follow the Emergency Operations Plan for notification to state survey agency of nursing home situation. Immediately upon discovering the failure to report the unusual occurrence, the facility discussed the incident in question with the CDPH surveyor who was conducting an abbreviated survey. An internal review of the incident was completed to determine root causes. The Administrator was interviewed and re-educated on reporting requirements. To ensure no similar oversight occurred, the previous 30 days of incident logs, nursing notes, and daily shift reports were audited by the Administrator on 12/19/25. Any event fitting CDPH's definition of an unusual occurrence was reviewed to verify it had been properly reported. No additional unreported unusual occurrences were identified. On 12/16/25, the Administrator received education from the Regional Operations Director on Title 22 §72541 reporting requirements, definitions of unusual occurrences, and required timelines and reporting processes. A CDPH Reporting Log was implemented to track all facility reported incidents from initial notice through CDPH submission. To ensure sustained correction, the Administrator will perform a weekly audit of all incidents for 12 weeks. After 12 weeks, audits will continue monthly for an additional 6 months. Findings will be reported at the Quality Assurance Performance Improvement (QAPI) meeting each month. Any identified gaps will result in immediate retraining and corrective action. All corrective actions will be fully implemented by 1/4/2026.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other K0522 citations
Improper Placement of Hydrocollator Machine Creates Fire Hazard
E
K0522 K522: Have an externally vented heating system.
Short Summary

Surveyors found a hydrocollator machine used for hot pads placed directly on a towel in the therapy area, with the device hot enough to cause burns upon touch. The machine was not installed to prevent ignition of combustibles, as required, and this was confirmed by the Maintenance Director. This deficiency could potentially affect eight occupants in the therapy area.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Combustible Materials Found on Heating Units
E
K0522 K522: Have an externally vented heating system.
Short Summary

The facility did not maintain heating units free of combustible materials, as required by NFPA 101. Combustible materials were observed on heating units in two resident rooms, which was confirmed by the Facility Administrator and Maintenance Director.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Combustible Materials on Heating Units
E
K0522 K522: Have an externally vented heating system.
Short Summary

The facility failed to maintain heating units free of combustible materials, as required by NFPA 101. Combustible materials were observed on heating units in two resident rooms, affecting two of the three facility levels. This was confirmed during an exit interview with the Facility Administrator and Maintenance Director.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙