K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
D

Deficiency in Generator Maintenance

Pinecrest Center For Rehabilitation And HealingNorth Miami, Florida Survey Completed on 03-11-2025

Summary

The facility failed to maintain its essential electric system generator in accordance with NFPA 101 standards. During a Life Safety Survey tour, it was observed that the generator room lacked high mortality spare parts, which are crucial for the maintenance and quick repair of the generator. This deficiency was identified during an inspection conducted at 2:00 pm on March 11, 2025, with the Maintenance Director present. The absence of these critical spare parts indicates a lapse in the facility's preparedness to ensure the generator's functionality in emergencies. The generator is required to supply power within 10 seconds, and regular maintenance and testing are mandated by NFPA 110. However, the lack of spare parts suggests that the facility may not be able to meet these requirements consistently, potentially compromising the safety and well-being of the residents. During a staff interview, the Maintenance Director acknowledged the deficiency, and this finding was also discussed with the Administrator during the exit conference. The report highlights the importance of having necessary spare parts readily available to maintain compliance with safety standards and ensure the reliability of the emergency power system.

Plan Of Correction

1. What corrective action will be accomplished? The following spare parts were ordered for our two on-site generators: 200 KW Generac Generator and 50KW Kato light Generator: * All engine filters: oil & air * All cooling system hoses & block heater hoses * All engine belts * Engine oil * Engine coolant 2. How we identified other residents having the potential to be affected by the deficient practice & corrective action taken: This deficiency could affect the occupants of the facility in the case of a loss of power. However, no residents have been affected by this practice. 3. Measures/systematic changes put into place: Once the supplies have been delivered, the Maintenance Director will establish a monthly inspection log to monitor all high mortality spare parts in the Generator Room. 4. How corrective action will be monitored: The Maintenance Director will ensure that all high mortality spare parts stored in the Generator Room are maintained in good working order and are available for use as needed. The inspection log will be reviewed at the monthly QA meeting until compliance has been determined. 1. What corrective action will be accomplished? The following spare parts were ordered for our two on-site generators: 200 KW Generac Generator and 50KW Kato light Generator: * All engine filters: oil & air * All cooling system hoses & block heater hoses * All engine belts * Engine oil * Engine coolant 2. How we identified other residents having the potential to be affected by the deficient practice & corrective action taken: This deficiency could affect the occupants of the facility in the case of a loss of power. However, no residents have been affected by this practice. 3. Measures/systematic changes put into place: Once the supplies have been delivered, the Maintenance Director will establish a monthly inspection log to monitor all high mortality spare parts in the Generator Room. 4. How corrective action will be monitored: The Maintenance Director will ensure that all high mortality spare parts stored in the Generator Room are maintained in good working order and are available for use as needed. The inspection log will be reviewed at the monthly QA meeting until compliance has been determined.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other K0918 citations
Failure to Perform and Document Annual Main and Feeder Breaker Testing
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to perform and/or document required annual testing and exercising of main and feeder circuit breakers in accordance with NFPA 99 and manufacturer recommendations. During record review, no documentation could be produced to show that the annual breaker exercises had been completed, and the Director of Facilities acknowledged this lack of records. This deficiency relates to the essential electrical system that supports life safety and critical branches during emergencies.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Exercise and Document Main and Feeder Breaker Maintenance per NFPA 99
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility did not have documentation showing that the essential electrical system’s main and feeder circuit breakers were exercised annually in accordance with manufacturer recommendations and NFPA 99 requirements. During record review with the Maintenance Director, no records could be produced to verify that these breakers had been properly exercised, and the Maintenance Director acknowledged this failure. This deficiency was cited as affecting all occupants due to noncompliance with required essential electrical system maintenance and testing standards.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Perform and Document Required Generator Battery Testing
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to perform and document required testing of backup generator batteries in accordance with NFPA 110. During record review, no documentation of generator battery testing was available, and the Maintenance Director acknowledged both the lack of records and a lack of knowledge of the NFPA 110 battery testing requirements. The report notes that this failure could result in loss of power affecting life support and life safety features for occupants.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Required Generator Battery Testing Documentation
D
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors identified a deficiency when the facility could not provide documentation that backup generator batteries were being tested in accordance with NFPA 110 and NFPA 99 requirements. During record review, no records of generator battery testing were available, and the Maintenance Director confirmed he was unable to locate the requested documentation. This failure concerns the essential electrical system that supports life safety and critical functions during power loss.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Perform Required Generator Battery Conductance Testing for Essential Electrical System
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to maintain its Essential Electrical System (EES) in accordance with NFPA 99 and related standards when record review showed that conductance testing was not performed for 2 of 2 sealed generator batteries over a defined period, and only one generator battery was tested during that time. During an interview, the Maintenance Director acknowledged that required testing had not been completed for both batteries. This lapse in required emergency power system maintenance affected the facility’s single EES and all residents and staff relying on it.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain and Document Required Generator Testing and Safety Features
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to maintain required documentation showing that its three generators were tested monthly and inspected and tested annually in accordance with NFPA 99 and NFPA 110. Despite multiple requests, no records of these tests or inspections were provided. During the facility tour, surveyors also observed that none of the three generators were equipped with remote manual stop buttons, and this was confirmed by the Maintenance Director. This deficient practice had the potential to affect all residents in the facility.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.