K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
F

Failure to Conduct Required Four-Hour Generator Load Test

Berkeley Pines Skilled Nursing CenterBerkeley, California Survey Completed on 06-10-2025

Summary

The facility failed to maintain compliance with NFPA 101 and NFPA 110 requirements for emergency power systems by not conducting the required four-hour load test on its 15-kilowatt propane generator. During a facility tour, surveyors requested and reviewed generator testing records and found that there was no documentation of a four-hour load test, as required to be performed at least once every 36 months. Instead, only records of two-hour load tests were available for review. The Environmental Supervisor confirmed during an interview that the vendor had only conducted two-hour load tests for the generator. This deficiency affected all 35 residents in the facility and both smoke compartments, as the generator is responsible for supplying essential electrical service in the event of a power outage. The lack of a four-hour load test could result in the malfunction of the emergency generator, as the facility could not demonstrate that the generator would operate under load for the required duration. No specific medical history or condition of the residents was mentioned in the report.

Plan Of Correction

Corrective Action: The facility conducted the 4-hour load test for the 15-kilowatt propane generator on 06/12/2025. II. How the facility will identify other residents: All residents have the potential to be affected by this practice. III. Systemic Change: The four-hour load test for the 15-kilowatt propane generator will be done every 3 years by the facility. IV. Monitoring Process: The facility will monitor its performance through our QAPI process. V. Date of Correction: 06/12/2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other K0918 citations
Failure to Perform and Document Annual Main and Feeder Breaker Testing
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to perform and/or document required annual testing and exercising of main and feeder circuit breakers in accordance with NFPA 99 and manufacturer recommendations. During record review, no documentation could be produced to show that the annual breaker exercises had been completed, and the Director of Facilities acknowledged this lack of records. This deficiency relates to the essential electrical system that supports life safety and critical branches during emergencies.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Exercise and Document Main and Feeder Breaker Maintenance per NFPA 99
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility did not have documentation showing that the essential electrical system’s main and feeder circuit breakers were exercised annually in accordance with manufacturer recommendations and NFPA 99 requirements. During record review with the Maintenance Director, no records could be produced to verify that these breakers had been properly exercised, and the Maintenance Director acknowledged this failure. This deficiency was cited as affecting all occupants due to noncompliance with required essential electrical system maintenance and testing standards.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Perform and Document Required Generator Battery Testing
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to perform and document required testing of backup generator batteries in accordance with NFPA 110. During record review, no documentation of generator battery testing was available, and the Maintenance Director acknowledged both the lack of records and a lack of knowledge of the NFPA 110 battery testing requirements. The report notes that this failure could result in loss of power affecting life support and life safety features for occupants.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Required Generator Battery Testing Documentation
D
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors identified a deficiency when the facility could not provide documentation that backup generator batteries were being tested in accordance with NFPA 110 and NFPA 99 requirements. During record review, no records of generator battery testing were available, and the Maintenance Director confirmed he was unable to locate the requested documentation. This failure concerns the essential electrical system that supports life safety and critical functions during power loss.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Perform Required Generator Battery Conductance Testing for Essential Electrical System
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to maintain its Essential Electrical System (EES) in accordance with NFPA 99 and related standards when record review showed that conductance testing was not performed for 2 of 2 sealed generator batteries over a defined period, and only one generator battery was tested during that time. During an interview, the Maintenance Director acknowledged that required testing had not been completed for both batteries. This lapse in required emergency power system maintenance affected the facility’s single EES and all residents and staff relying on it.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain and Document Required Generator Testing and Safety Features
F
K0918 K918: Have generator or other power source capable of supplying service within 10 seconds.
Short Summary

Surveyors found that the facility failed to maintain required documentation showing that its three generators were tested monthly and inspected and tested annually in accordance with NFPA 99 and NFPA 110. Despite multiple requests, no records of these tests or inspections were provided. During the facility tour, surveyors also observed that none of the three generators were equipped with remote manual stop buttons, and this was confirmed by the Maintenance Director. This deficient practice had the potential to affect all residents in the facility.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙