K0281 K281: Install proper backup exit lighting.
E

Inadequate Illumination of Egress Pathways

Absolut Center For Nursing And Rehabilitation At TPainted Post, New York Survey Completed on 02-28-2025

Summary

During a Life Safety Code Survey conducted from February 24 to February 28, 2025, it was observed that the facility failed to ensure proper illumination of the means of egress for four of seven exits. Specifically, the outdoor exit discharge pathways lacked sufficient lighting to the public way. Observations made on February 24, 2025, between 1:11 PM and 1:24 PM revealed that there was no exterior lighting present to illuminate several sections of the exterior egress pathways. These included a 100-foot-long section between the exits from the A1 and D2 corridors, a 50-foot-long section between the exits from the D2 corridor and physical therapy, a 100-foot-long section between the exits from the D1 and C2 corridors, and a 50-foot-long section between the exits from the C2 corridor and the main entrance. During an interview conducted on the same day at 1:24 PM, the Environmental Services Director stated they were unaware of the lack of lighting between exits or the need for additional lighting. The director acknowledged the presence of lighting at the exits but indicated that additional lighting could be added for the pathways.

Plan Of Correction

Plan of Correction: Approved March 19, 2025 K281 Corrective Action - To ensure the facility meets the requirements of illumination of means of egress, including exit discharge, is arranged in accordance with 7.8 and shall either be continuously in operation or capable of automatic operation without manual intervention. 1) The facility will install lighting: in the 100 foot long section of exterior egress pathway between the exits from A1 and D2 corridors; the 50 foot long section of exterior egress pathway between the exits from D2 and D2 physical therapy; the 100 foot long section of exterior egress pathway between the exits from D1 and C2 corridors; and the 50 foot long section of exterior egress pathway between the exits from the C2 corridors and the main entrance so that the egress paths are illuminated in compliance with the Life Safety Code. 2) The Director of maintenance will conduct a complete inspection of all means of egress to identify any additional areas that may require increased lighting in compliance with the Life Safety Code. Annual inspection of egress path lighting will be added to the facility’s electronic work order system. 3) The Administrator will oversee in-services to all maintenance department staff in regard to the life safety requirements for means of egress lighting. 4) All means of egress will be audited monthly for 3 months and as needed based on the audits findings. Audits will verify all egress lighting meets the requirement of the Life Safety Code. The Administrator will monitor this process and review the results monthly at QAPI meetings. If continued improvement is required, the committee may make further recommendations. The Administrator will assume overall responsibility for the correction of K281.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other K0281 citations
Failure to Ensure Continuous Illumination in Egress Pathway
D
K0281 K281: Install proper backup exit lighting.
Short Summary

The facility did not maintain continuous illumination in the Rehab corridor, as required by NFPA 101 standards. During a survey, it was found that turning off the wall-mounted light switches extinguished all lights in the corridor leading to an emergency stairwell exit. The Director of Maintenance confirmed the issue, noting that the lights would be continuous.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Illuminate Egress Pathways
E
K0281 K281: Install proper backup exit lighting.
Short Summary

The facility did not provide proper illumination for egress pathways, as required by NFPA 101. Observations revealed that exit doors from the French Quarter wing, the main entrance, and the Spanish Villa wing lacked necessary lighting for safe egress during darkness. These findings were confirmed by the Maintenance Director and acknowledged by the Administrator.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Ensure Continuous Illumination in Egress Pathway
D
K0281 K281: Install proper backup exit lighting.
Short Summary

The facility did not maintain continuous illumination in the means of egress as required by NFPA 101. During a survey, it was found that turning off the wall-mounted light switches in the fifth-floor dining room also turned off all lights, including those needed for an emergency stairwell exit. This issue was identified on one of the three resident floors, and the Director of Maintenance confirmed the lights would be continuous.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Continuous Egress Illumination
E
K0281 K281: Install proper backup exit lighting.
Short Summary

The facility did not maintain continuous illumination of the means of egress in one of five stair towers. Light fixtures failed to illuminate the exit by Component 1, as observed and confirmed by the Director of Maintenance.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Illumination in Exit Stairways
E
K0281 K281: Install proper backup exit lighting.
Short Summary

The facility failed to maintain proper illumination in the exit stairways, affecting one of three floors. An observation revealed that the lights in the first floor South main stair tower were not illuminating. This was confirmed during an exit interview with the Administrator and the Maintenance Director.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Provide Automatic Emergency Illumination
E
K0281 K281: Install proper backup exit lighting.
Short Summary

The facility failed to ensure emergency illumination operated automatically along the means of egress, as required by NFPA 101:2012. In the C-hall dining room, a single wall switch controlled all ceiling lights, affecting 25 residents. This was confirmed by U.S. FOIA representatives during an observation.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release June 24, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙